Project Location: Shanghai
Delivery Time: 2015-07
Project Name
Project Description
The project uses a single-phase prepaid meter. The number is about 2,000.
Prepaid system:

The project uses a soft launcher. Soft start effectively reduces the starting current of the motor, which can reduce the distribution capacity and avoid capacity increase...
View More >
The project uses a single three-phase mechanical meter for measuring a single three-phase AC active energy meter with a reference frequency of 50HZ. Its technical indicat...
View More >
Jiuzhai Paradise Hotel has a construction area of 150,000 square meters, integrating conference, catering, entertainment, vacation, leisure, health care, shopping and acc...
View More >
400-0577-818
Consultation HotlineMobile Site
Copyright © 2025 China · Huabang Power Technology Co., Ltd. All rights reserved.
ICP: 浙ICP备09083223号-8