Project Location: Beijing capital
Delivery Time: 2016-02
Project Name
Project Description
The project uses single-phase plug-in card meters, and single-phase prepaid meters use microelectronic technology to ADE7755 metered energy. The meter that complies with GB/T17215.321-2008 and GB/T18460-2001 standards adopts a fully shielded and fully sealed structure, and uses an advanced microcontroller processing system for data collection, processing and storage, and has the characteristics of good anti-electromagnetic interference, low power consumption, high precision, anti-theft, high overload, and long life.
Prepaid system:

Jiuzhai Paradise Hotel has a construction area of 150,000 square meters, integrating conference, catering, entertainment, vacation, leisure, health care, shopping and acc...
View More >
The land area of the Sanya Haitang Bay Sunshine International Hotel Project (Phase I) is 62,219.13 square meters. The construction content of the project (phase I) consis...
View More >
The resort has 25 villas, 205 standard rooms and VIP suites, large and small restaurants, private rooms, various venues, business centers, as well as dance halls, billiar...
View More >
400-0577-818
Consultation HotlineMobile Site
Copyright © 2025 Huabang Power Technology Co., Ltd. All rights reserved.
ICP: 浙ICP备09083223号-8