Project Location: Zhuhai City, Guangdong Province
Delivery Time: 2015-06
Project Name
Project Description
The third phase of Zhuhai deep-water marine engineering equipment manufacturing base is located at No. 99 Pinggang Road, Gaolan Port Economic Zone, with a construction land area of 2.07 million square meters, including 1.95 million square meters of land area and 120,000 square meters of port pool, with a total construction area of 45,000 square meters. It is worth mentioning that the third phase of the Zhuhai deep-water offshore engineering equipment manufacturing base will build a 272,000-square-meter final assembly site and five wharves with a total area of 64,500 square meters.
Products: Three-phase rail prepaid energy meter (remote electricity sales) DTSY866
System scheme:

Liaohe Oilfield Company is a backbone enterprise under China National Petroleum Corporation and the largest heavy oil and high condensate oil production base in China. Th...
View More >
Jianghan Oilfield is located in the Jianghan Plain, headquartered in Guanghua Town, Qianjiang City, Hubei Province, north of the Han River, south of the Yangtze River, 15...
View More >
The base covers an area of 646 hectares, the eastern half is the living area, the western half is the industrial zone, since the construction of the base in 1993, it has ...
View More >
400-0577-818
Consultation HotlineMobile Site
Copyright © 2025 Huabang Power Technology Co., Ltd. All rights reserved.
ICP: 浙ICP备09083223号-8