Project Location: Yanbian, Jilin
Delivery Time: 2012-09
Project Name
Project Description
Jilin Yanbian Mining Bureau, whose office is located in Yanbian, the largest concentration of Koreans in China, is mainly engaged in coal production and mine construction.
The project uses a three-phase multi-function energy meter, which can measure forward and reverse active and reactive energy, and measure the maximum demand of active, reactive and each rate. It has 4 rates, 10 time periods, 4 time zones, and 5 daily time periods, which can realize various event recording and load curve recording such as loss of voltage, current loss, demand clearance, programming, etc., and has functions such as power pulse output and clock signal output. Its product performance indicators comply with the technical requirements of GB/T17215.321-2008 "Level 1 and 2 Static AC Active Energy Meters", GB/T17215.323-2008 "Level 2 and 3 Static AC Reactive Power Meters" and GB/T17215.301-2007 "Multi-functional Energy Meters" standards. The communication protocol conforms to DL/T645-1997 "Communication Protocol for Multifunctional Energy Meters" and special regulations required by users.
The project uses a three-phase prepaid multi-rate remote control meter, which can realize the function of IC prepayment, purchase electricity first and then use electrici...
View More >
The project uses a three-phase remote control meter with 485 communication, which can realize remote meter reading, real-time meter reading, data query and other function...
View More >
Pingdingshan Tianan Coal Industry Ninth Mine Co., Ltd. (hereinafter referred to as "Pingmei Co., Ltd. Ninth Mine") is a subsidiary of China Pingmei Shenma Group...
View More >